This set of Civil Engineering Multiple Choice Questions & Answers (MCQs) focuses on “ Cost and Estimation ”. These Mcqs are chosen from a collection of most authoritative and best reference books on Civil Engineering. Our aim is to prepare an individual for competitive exams like NTS, GAT, ECAT, University and College entrance exams, Jobs and interviews. One should practice our MCQS to assimilate Cost and Estimation comprehensively.

  1. Home
  2. »
  3. Engineering
  4. »
  5. Civil Engineering Mcqs
  6. »
  7. Cost and Estimation Mcqs
  8. »
  9. Page 6

76.
Pick up the item whose weight is added to the weight of respective item, is________________?

Cleats

Brackets

Bolts

All the above

77.
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is____________________?

3250 m3

3225 m3

3275 m3

3300 m3

79.
Pick up the correct statement from the following?

All pipes and fittings are classified according to their diameters

The diameter of the pipes is the nominal diameter of internal bore

All pipes are measured along the centre line of the pipes in metres

All the above

80.
Pick up the correct statement from the following?

In a gully trap, a water seal of 6 to 7.5 cm is provided

The gully trap collects waste water from the kitchen, sink, wash basins, etc.

The gully trap disconnects the sullage drain from the main drainage system

The grating provided over gully traps is 23 cm square

81.
Pick up the correct statement from the following?

The bent up bars at a support resist the negative bending moment

The bent up bars at a support resist the sharing force

The bending of bars near supports is generally at 45°

All the above